Contact

聯絡我們

Send us the equipment list or the assessment items you need to cover, and we will look at what can be addressed

Fill in the information below and we will get back to you. If you already have an equipment list or specific assessment requirements, include them in the message field — it lets us assess the scope before we talk.

Situations worth discussing

  • Estimating integration scope at bid stage

    The protocols and controllable range of on-site equipment directly affect integration effort and pricing. Confirming scope before bidding avoids discovering gaps after award.

  • A gap in the assessment items

    Where the planned systems fall short on a specific item, that part can be adopted on its own without changing the rest of the plan.

  • Retrofitting an existing building

    Where equipment is already running and the site cannot be shut down or rewired, we can assess what is reachable over existing protocols.

  • A system left without support after handover

    Where the original integrator is no longer reachable, or the system has no documentation, we can assess the scope of taking it over or rebuilding it.

What to prepare

None of the following is required, but the more complete it is, the more specific the assessment:

  • Equipment list with make and model
  • Protocol or control interface documentation for existing equipment
  • Target grade or specific assessment items
  • Site type and scale
  • Schedule milestones